“Strengthening integrated transboundary source-to-sea management of the Ruvuma River Basin and its coastal zones to ensure ecosystem health &livelihood security”

0
default

default

Tuesday, 3rd March 2026 Media Advisory

Malawi, Mozambique, and Tanzania to Launch Joint Transboundary Ruvuma River Basin Project
Inception Workshop to Mark Formal Commencement of USD 7.12 Million GEF-Funded Initiative
The Republic of Malawi, the Republic of Mozambique, and the United Republic of Tanzania will convene an inception workshop from Wednesday 4th to Thursday 😙5th March 2026 in Tanzania to formally launch a major joint initiative aimed at strengthening integrated transboundary management of the Ruvuma River Basin and its associated coastal and marine ecosystems.
The workshop marks the official commencement of the project titled “Strengthening integrated transboundary source-to-sea management of the Ruvuma River Basin and its coastal zones to ensure ecosystem health and livelihood security.”
Valued at USD 7.12 million and scheduled for implementation over 60 months through December 2030, the project is funded by the Global Environment Facility (GEF). It is led by the International Union for Conservation of Nature as the GEF Implementing Agency, in partnership with Global Water Partnership Southern Africa and Wetlands International as Executing Agencies.
INCEPTION WORKSHOP DETAILS
Date:  4-5 March 2026
Workshop Format: In-person
Location: Johari Rotana, Dar es Salaam – Tanzania
Hosting Partners: Joint Development and Management of Rovuma /Ruvuma River Basin, International Union for Conservation of Nature (IUCN), Global Water Partnership Southern Africa (GWPSA), Wetlands International – East Africa (WIEA)

“Strengthening integrated transboundary source-to-sea management of the Ruvuma River Basin and its coastal zones to ensure ecosystem health &livelihood security”
“Strengthening integrated transboundary source-to-sea management of the Ruvuma River Basin and its coastal zones to ensure ecosystem health &livelihood security”
“Strengthening integrated transboundary source-to-sea management of the Ruvuma River Basin and its coastal zones to ensure ecosystem health &livelihood security”

The Ruvuma River serves as a vital water source for communities, agriculture, and industries across the three member states, but despite its benefits, the basin faces several challenges that include a lack of comprehensive management plans, hampering the sustainable use and conservation of its resources.
The basin is also increasingly vulnerable to the adversities of climate change, manifesting in unpredictable rainfall patterns and extreme weather events. Compounding these challenges is the scarcity of reliable data and the limited involvement of local stakeholders in decision-making processes.

The workshop is expected to lay a strong foundation for coordinated, long-term transboundary cooperation in the Ruvuma River Basin and to reinforce shared commitments among member states toward sustainable basin and coastal management.
The project adopts a comprehensive source-to-sea approach that recognises the interconnectedness of land, freshwater, coastal, and marine ecosystems. It aims to safeguard ecosystem integrity while strengthening climate resilience and supporting inclusive, sustainable livelihoods across the basin and its coastal zones.
Implementation will be anchored in regional and national institutions across the three riparian states, with transboundary coordination mechanisms serving as focal custodians for basin-level governance and cooperation.
The Ruvuma River Basin covers an area of approximately 155,000 km2, with the Mozambican territory covering 100,000 km2 (65%), Tanzania covering 52,000 km2 (~34%), while the remaining part is in Malawi, covering 2,500 km2 (<2%).
BACKGROUND
On January 8th, 2024, the Global Environmental Facility (GEF) approved the concept note (Project Identification Form (PIF) for the Strengthening integrated transboundary source-to-sea management of the Ruvuma River Basin and its coastal zones to ensure ecosystem health and livelihood security Project. The Project was approved under International Waters focal area.
The approval of the PIF was accompanied by the Project Preparation Grant (PPG) approval which marked the start of the 12-month journey to prepare a full-sized project. The project preparation was kicked through the recruitment of the PPG Consultant, Water, Environment and Beyond (WE&B) to support the preparation of the Project Document (ProDoc), CEO Endorsement Request, detailed budget and workplan, and relevant annexes related to environmental and social safeguards.
The Project design was launched at a stakeholder inception meeting held on 3-4 October 2024, in Dar es Salaam, Tanzania. The event was attended by delegates from the Government of Malawi, Mozambique and Tanzania, key partners, private sector, academia and media. This was followed by a series of stakeholder consultations across the Basin targeting Southern Coast Basin (Malawi), ARA Norte (Mozambique) and Ruvuma and Southern Coast (Tanzania) between November to December 2024. The validation workshop for the ProDoc was held in Lilongwe, Malawi, on 20th – 21st January 2025.
As a requirement, the Project was endorsed by GEF focal points in the Basin. The full-sized project was approved by the GEF in August 2025, with a total GEF grant of $7,122,018 and co-financing commitment from Member States partners of co-financing commitments totalling $ 65,490,480. The Project will be implemented for five years until 2030.
For media interviews:
Teresa Chirwa-Ndanga, Head of Communications, Global Water Partnership Southern Africa: teresa.chirwandanga@gwpsaf.org
Priscilla Kagwa , Communications Officer, Wetlands International Eastern Africa: pkagwa@wetlands-eafrica.org

绝妙集团公布50亿美元投资计划​作者:海伦·博瓦利亚(Hellen Bwalya)​绝妙集团有限公司(Wonderful Group of Companies Limited)通过其子公司赞比亚联合资本化肥有限公司(United Capital Fertilizer Zambia Company Limited),在其工业园区举行的奠基仪式上,正式启动了一项跨越2025年至2030年的50亿美元中长期工业投资宏伟计划。集团首席执行官黄耀弛先生在致答谢词时强调,该举措巩固了集团致力于提升赞比亚经济潜力、农业发展和就业水平的长期承诺。本次活动展示了多项价值数亿美元的制造业扩建及基础设施升级项目,旨在将赞比亚打造成中东非地区的核心工业强国。​在这项50亿美元的投资承诺中,园区内大规模的化工与化肥厂建设处于核心地位。继投资6.8亿美元的一期尿素生产厂竣工并投入运营后,集团正在稳步推进投资3.00亿美元的农化磷肥厂建设,预计将于第一季度投产,用于生产专用二铵(DAP)化肥。进一步的扩建计划还包括投资16亿美元的二期尿素项目和投资7.00亿美元的磷肥扩建项目,同时集团还将努力吸引更多绿色与高新技术投资者入驻运营。​为了支持这一工业增长并优化大宗运输物流,绝妙集团宣布了多项基础设施升级计划,包括升级连接当地矿山并穿过该工业园区的区域铁路网络、将蒙格维路(Mungwi Road)的部分路段改造为双向四车道,以及拓宽通往蒙布瓦路(Mumbwa Road)的连接线。这些基础设施项目将在完成内部财务手续后,通过政府与社会资本合作(PPP)模式实施,以畅通交通流量并缩短物资交付时间。黄耀弛先生对关键金融合作伙伴表达了谢意,向由艾莎银行(Absa Bank PLC)和赞比亚国家商业银行(ZANACO Bank PLC)牵头的银行银团为相关建设提供资金支持致以深切感谢。​在澄清公司身份时,黄耀弛先生指出,尽管早期外界存在误解,但绝妙集团和联合资本化肥公司均是值得骄傲的赞比亚本土企业。他强调,管理层中仅有两名中国籍员工,且均未直接参与日常运营,企业的行政控制权与管理权完全掌握在赞比亚本地人手中。黄耀弛先生重申了集团的承诺,并对赞比亚实现自产自销、对外出口以及引领东非和南部非洲工业未来的能力表达了坚定信心。

Leave a Reply

Your email address will not be published. Required fields are marked *

You may have missed

绝妙集团公布50亿美元投资计划​作者:海伦·博瓦利亚(Hellen Bwalya)​绝妙集团有限公司(Wonderful Group of Companies Limited)通过其子公司赞比亚联合资本化肥有限公司(United Capital Fertilizer Zambia Company Limited),在其工业园区举行的奠基仪式上,正式启动了一项跨越2025年至2030年的50亿美元中长期工业投资宏伟计划。集团首席执行官黄耀弛先生在致答谢词时强调,该举措巩固了集团致力于提升赞比亚经济潜力、农业发展和就业水平的长期承诺。本次活动展示了多项价值数亿美元的制造业扩建及基础设施升级项目,旨在将赞比亚打造成中东非地区的核心工业强国。​在这项50亿美元的投资承诺中,园区内大规模的化工与化肥厂建设处于核心地位。继投资6.8亿美元的一期尿素生产厂竣工并投入运营后,集团正在稳步推进投资3.00亿美元的农化磷肥厂建设,预计将于第一季度投产,用于生产专用二铵(DAP)化肥。进一步的扩建计划还包括投资16亿美元的二期尿素项目和投资7.00亿美元的磷肥扩建项目,同时集团还将努力吸引更多绿色与高新技术投资者入驻运营。​为了支持这一工业增长并优化大宗运输物流,绝妙集团宣布了多项基础设施升级计划,包括升级连接当地矿山并穿过该工业园区的区域铁路网络、将蒙格维路(Mungwi Road)的部分路段改造为双向四车道,以及拓宽通往蒙布瓦路(Mumbwa Road)的连接线。这些基础设施项目将在完成内部财务手续后,通过政府与社会资本合作(PPP)模式实施,以畅通交通流量并缩短物资交付时间。黄耀弛先生对关键金融合作伙伴表达了谢意,向由艾莎银行(Absa Bank PLC)和赞比亚国家商业银行(ZANACO Bank PLC)牵头的银行银团为相关建设提供资金支持致以深切感谢。​在澄清公司身份时,黄耀弛先生指出,尽管早期外界存在误解,但绝妙集团和联合资本化肥公司均是值得骄傲的赞比亚本土企业。他强调,管理层中仅有两名中国籍员工,且均未直接参与日常运营,企业的行政控制权与管理权完全掌握在赞比亚本地人手中。黄耀弛先生重申了集团的承诺,并对赞比亚实现自产自销、对外出口以及引领东非和南部非洲工业未来的能力表达了坚定信心。